Tag: studio

April 28, 2021- Floor is done, can I afford the rest?

I am not going to go on about the cost of materials. I will say that plywood has gone up 20% in the last month; other building materials as well. I found a good deal at the local ‘discount’ building materials location. This is 3/4″ MDO overlay plywood. It couldn’t be more perfect for my application since I am not planning on putting a finished floor, I am running out of headroom.

I have a few things I can do before buying materials again but my next major move is to buy framing lumber. I can start prepping my door for painting and cutting to size. I am also planning on removing the insulation around the duct work in favor of a more attractive solution like rigid foam. I can also start working on the rough wiring as well.

Today is going to be quick with some pictures of progress. I am moving slowly because I am trying to buy materials as I need them. I am also spending one to two hours a day working on the project, as soon as work ends usually.

April 6, 2021- Maintenance Today

One thing that people who don’t run a website might not know is that it actually requires active effort. Everyday when I login to the dashboard to begin writing, there is a Health summary on issues that are outstanding. Some are warnings and some are actual issues.

Today, I wasn’t able to login to the dashboard to write. I had some issues with the SSL certificate. It seems like every two months, there is some kind of problem with SSL. I suspect that if I ponied up some money, that I wouldn’t have this problem and probably wouldn’t have to make changes.

I bumbled my way through fixing the problem. I also found some suggested improvements, which I also made. One nice thing is that even though I know very little about Linux, I can usually search and find some answers on the internet. Even platform and provider issues there is usually some help.

Since I dont have time to generate a more material today, you will have to settle for a picture of my progress on the office project. It is slow, but moving one small piece at a time.

The next step is to remove the drywall to the right of the desk. I am going to frame around the block so that I can insulate properly because believe me, it is cold down here. More on that later.

March 8, 2020- It’ll do for now

I suppose that you could say that this is my second official weekend since I began my new job. While working for Amazon, I don’t think that I had an entire weekend but I did have blocks of two consecutive days off, I just never really knew when they would be. We would get our schedule for the next week (starting on Sunday) on Friday. I pretty much kept every kind of planning in limbo.

So, now that there is some normalcy, I am feeling the pressure to get stuff done when I have the time. It is also the appropriate kind of stuff that needs to be done like I finished pruning the apple tree on Saturday. I needed light, I wanted reasonable weather and I needed it to be done before it starts budding out, which is coming fast. One more thing about that, I haven’t done that job in probably over ten years, it took a lot more effort than I remember or expected.

I have stated that building an office is a priority. I can’t build an office if I am spending all of Saturday pruning and all of Sunday with the family. I talked about pruning already but my boys have a campout this weekend with the Boy Scouts and despite all of our previous efforts, they still don’t have adequate gear. We had to get that sorted out before next Saturday because they need pack weights and meal plans to be made, etc.

For the last couple of weeks, I have been working off the dining table. That works to a point, but we need that space to eat. That means that I am daily setting up and tearing down. I have also added an extra monitor to my routine because the workspace on a single laptop display is not good for comparing two documents or having a meeting and viewing other documents at the same time. For productivity reasons, I needed an office sooner rather than later.

I decided last week that part of what was holding me back on starting was that it was such a mess in the basement. Stuff is piled everywhere. One thing that I have to do during the rainy season is make sure that anything that could get damaged is off of the floor. That leads piling stuff on stuff to protect our precious junk. It is not just that, it is also I am the only one who manages anything in the basement. It becomes the refuge everything that has been rotated out of service, but still has value including nick-knacks, clothes, seasonal items, etc. I cant even start until I have room to start and I have no room to start.

Sunday night, I started clearing the way and just organizing. I thought that if I could just clear enough space to work, it would also help get me motivated to continue. The other bugaboo is that the basement is essentially unheated. It is tempered by being mostly underground and there is some leaking heat, but too cold to want to sit for hours. I figured that would also push me to work faster. Here is what I came up with.

After sitting through my first one hour meeting, I knew that I was going to have to make some changes to the heat situation. I have a sweatshirt and a jacket on as well as wearing a hat. My upper body is OK, but not my legs and feet. I have a baseboard heater that I salvaged out of the apartment remodel that I was planning on using in the office, but I need heat now. I also have an empty 240V circuit that had a baseboard heater in the bathroom which I removed years ago because the bathroom has central heat now.

I quickly wired the baseboard heater under my computer table to see if that will make a difference, I think it will but I need to be more in front of the heater and not to the side like I am currently setup. So, more junk organizing to come. I may also need to add some deflectors to keep the heat originating under the table and not defusing in all directions.

I will want to shut-off the heat at the circuit breaker each day because a baseboard will continue to heat if the temperature drops below a minimum level, nominally 50 degrees F. I also want to get a thermometer down here to monitor the daily temperature swings with and without heat. My ultimate office plan includes insulation, so this heater will be completely adequate for that use but there is no way for it to warm a leaky basement. Right now this is only a comfort measure.