August 4, 2020 – Progress Report

I will be signing off for another round of family time. I think that I will be back Friday, I would guess early afternoon. But with all of the stuff that will need to be done I suspect this is the last post of the week.

It pains me to put this aside when progress is rapidly happening. In addition, there is still a lot of punchlist items to do. There is nothing I can really do about it but be in the moment.

To summarize this weeks progress, floors are going in, the shower enclosure is up, the bathroom door is installed, new counter tops with a refurbished sink, all electrical is done, rough in plumbing is complete and waiting for fixtures and half of the remaining siding is up.

So what is left? Paint and install remaining siding, final exterior touch up, hang gutters, landscape grading, data wiring, finish the floors, paint and install all trim, install cabinets and fixtures in the bathroom and kitchen, add hot water heater, back splash in bathroom and kitchen. That is it you say? I know that it might seem like a daunting list, but each one of them is closing a phase with visible progress.

As much as I have enjoyed the process and the time, I am ready for completion. I have felt the pressure to finish since I started and now that we are six weeks past the planned finish date, this is the largest stressor for leaving for another three days. For the most part, my scope of work is complete – that is the exterior work. None of that prevents move in. But, I have taken up the torch to help wherever I can on the inside, because that will ultimately save money and time in the end.

June 17, 2020 – A progress report

Last night, I started a test to see if I could get non-hosted videos on this blog. Unfortunately, I have to upgrade packages to do so and I know that this is not the final home of this blog, so I am not going to invest in that at the moment.

In lieu of doing something new, I will summarize where I am at on this current project. I am in the punchlist phase. That means that I am essentially done with my work in the apartment minus a few things here and there. I still need to

  • Hang a ceiling fan
  • Install some window film to obscure direct view – waiting for delivery
  • Build a face frame for the microwave cabinet
  • Oversee cabinet painting and final ceiling touch-up – waiting for paint
  • sub floor patching
  • Install the baseboard molding – waiting for floor
  • Move in and install the appliances – waiting for floor

As you can see, the bathroom is a long way from being done. I would estimate two weeks of solid work. I will be doing the roofing when the framing is done. And I am waiting for the framing to be done so I can finish the siding and painting.