Yesterday I revealed my affliction. I am in quarantine until Sunday by request of the county. I definitely have stuff that I want to get done and not over do it at the same time. So, I will keep going on my office project.
I have three walls up and I don’t have enough lumber to finish the fourth wall. As much as I want to finish the framing, I can’t leave to get what I need. Fortunately, I can shift gears and work on other aspects. To wait it out, I am going do the following things.
- Box in the HVAC duct with rigid insulation
- Start the rough wiring, High and Low voltage
- Cobble leftover rigid insulation into the bays that are less than 14 1/2″ in width, but after the wiring
- Start working on the door. Remove door from the jamb and all hardware. Clean-up loose and flaking stain. Sand and prime door. Cut to height.
I am going to keep it short today for a number of reasons. But there are some pictures of my progress so far.
End Your Programming Routine: Always have contingency plans in your back pocket because you never know when your circumstances will change. As I have been trying to cashflow this project, I had already had thoughts about overrunning my current material stock until the next payday. My real surprise is that I have moved much quicker through the framing than I estimated. I am going about twice as fast as I projected.